Scope of HVAC work :

  • Double Skin Air Handling Unit’s and Ventilations Systems.
  • Room Data Sheet & Heat load calculations for the system.
  • High side HVAC – Chiller, Cooling tower, Pumps and its control system.
  • Filters-; 20µ, 10µ, 5µ, 3µ, 0.3µ as per EU or ISO standards.
  • Design of areas as per Grade D, C , B or ISO 8, 7 & 5 as per international guidelines.
  • Dehumidifier with heat recovery wheel & Humidifier.
  • Air distribution i.e. ducting, insulation, damper, fire damper, diffusers & grills.
  • Chilled water, hot water, condenser and refrigerant piping.
  • HVAC Power & Control panel, cabling and instrumentation.
  • Duct able and Hi Wall Split air conditioning unit.
  • Qualification and validation work.
  • Execution of Total low side and high side HVAC projects.
 
     
 
Scope of Electrical work :

  • HT Work with two pole or four pole structure with CTPT, HT Breaker, Transformer.
  • Power distribution panel i.e. LTPCC, MCC, MPDB, MLDB, PDB, LDB.
  • HT & LT Cable Schedule and Cable Selection.
  • Lighting calculation and light fixture selection.
  • Earthing and lightening arrester grid.
  • Street light and external lighting.
  • Power, LAN, Telephone distribution network.
  • Installation & Commissioning of equipment i.e. Transformer, DG set, UPS and etc.
  • Liasoning with Electricity board for load sanction and charging of Transformer , DG Set and other equipments.
  • Execution of Total HT and LT Electrical projects.
 
     
 
Scope of  Mechanical Piping & Erection work  :

  • P & ID, Piping Distribution plan, Isometric view and MTO.
  • External and internal pipe rack fabrication and erection.
  • Fabrication and erection of IBR and Non IBR Piping.
  • Fabrication and installation of fire hydrant network.
  • Equipment rigging and installation.
  • Painting to Structure and piping as per Code.
  • Positioning & Installation of Instrumentation.
  • Cold and Hot Insulation with or without cladding.
  • Liasoning with IBR authorities, CCOE approval for tank forms and Fire Inspector approvals.
  • Execution of Total Mechanical piping and erection projects.
 
     
  Turnkey Solutions :
 
   
 
 
  • Process
  • Mechanical
  • Electrical
  • Civil
  • Control Engineering
  • Process Architecture
  • HVAC
  • Building Management System
 
  • Procurement
  • Value Engineering
  • Time Schedule
  • Commissioning & Validation
  • As-built drawings
  • Project Construction management :
  1. Utilities  
        2. Instrumentation  
        3. Clean room  
        4. Validation